Citizendia

Hood Canal Bridge
Official name William A. Bugge Bridge
Carries Washington SR 104
Crosses Hood Canal
Locale Kitsap and Jefferson counties, Washington
Maintained by Washington State DOT
Design Pontoon bridge
Total length 7,869 ft (2,398 m)
AADT 13327 (2002)[1]
Opening date August 12, 1961
Coordinates 47°51′35″N, 122°37′28″W

The Hood Canal Bridge is located in Washington state in the USA on State Route 104 and connects the Olympic Peninsula and the Kitsap Peninsula across Hood Canal. State Route 104 is a state highway in the US state of Washington. Hood Canal is a Fjord off Puget Sound in the US state of Washington. Kitsap County is a County located in the US state of Washington, named after Chief Kitsap of the Suquamish tribe Jefferson County is a County located in the US state of Washington and named after Thomas Jefferson. Washington ( is a state in the Pacific Northwest region of the United States. The Washington State Department of Transportation ( WSDOT) was established in 1905 A pontoon bridge or floating bridge is a Bridge that floats on water supported by barge-or-boat-like pontoons to support the bridge deck and its dynamic Annual average daily traffic, abbrevated AADT, is a measure used primarily in Transportation planning and transportation engineering. A geographic coordinate system enables every location on the Earth to be specified in three coordinates using mainly a spherical coordinate system. Washington ( is a state in the Pacific Northwest region of the United States. State Route 104 is a state highway in the US state of Washington. Geography The Olympic Peninsula is home to some of the only Temperate rain forests in the world including the Hoh, Queets, and Quinault The Kitsap Peninsula is an arm of land that is part of the larger Olympic Peninsula in Washington Hood Canal is a Fjord off Puget Sound in the US state of Washington. It is 7,869 feet (2,398 m) long, making it the longest floating bridge in the world located in a saltwater tidal basin, and the third longest floating bridge overall. It was the second concrete floating bridge constructed in Washington State and first opened in 1961. Since that time, it has become a vital link for local residents, freight haulers, commuters, and recreational travelers. The convenience it provides has had a major impact on economic development, especially in eastern Jefferson County. Jefferson County is a County located in the US state of Washington and named after Thomas Jefferson.

The full title of the Hood Canal Bridge, the William A. Bugge bridge, was named after the director of the Department of Highways, William A. Bugge (1900-1992), from 1949 to 1963 who was a leader in the planning and construction of the bridge. William Adair Bugge ( July 10, 1900 - November 14, 1992) was a civil engineer who played a major role in the development of the transportation The bridge, however, has continued to be popularly known as the Hood Canal Bridge.

Contents

History

Design, fabrication, and construction

The design and planning process for the Hood Canal Bridge took nearly a decade amid criticism from some engineers throughout that time. Critics questioned the use of floating pontoons over salt water, especially at a location where tide fluctuations vary as much as eighteen feet and the funneling effect of the Hood Canal might magnify the intensity of winds and tides. A pontoon is a flat-bottomed Boat or the floats used to support a structure on water The depth of the water, however, made construction of support columns for other bridge types prohibitively expensive.

The pontoons for the bridge were fabricated in the Duwamish Waterway in Seattle, Washington. The Duwamish River is the name of the lower 12 miles (19 km of Washington state's Green River. During fabrication two of the pontoons sank. When they were attached for the first time, and then towed into place and anchored, sea conditions in the Hood Canal were too severe and the pontoons were returned to a nearby bay until a better method of attaching could be devised. The architects and the contractor decided the design was faulty. A new contractor was hired and the design modified. It was decided to use a large rubber dam between each of the two pontoons as they were attached, clean the concrete surfaces of all marine growth, epoxy, and tension them with a number of cables welded to a variety of attachment points. In Chemistry, epoxy or polyepoxide is a Thermosetting Epoxide Polymer that cures (polymerizes and crosslinks when mixed with a This system seemed to work from when the bridge opened in 1961 until the disaster of 1979.

1979 sinking

The Hood Canal Bridge suffered catastrophic failure during the February 13, 1979 Windstorm. A catastrophic failure is a sudden and total failure of some system from which recovery is impossible The February 13 1979 Windstorm is a natural phenomenon that took place on February 13, 1979 in Canada During the night the bridge had withstood sustained winds of up to 85 mph (137 km/h) and gusts estimated at 120 mph (193 km/h), and finally succumbed at about 7:00 a. m. , February 13. Events 1258 - Baghdad falls to the Mongols, and the Abbasid Caliphate is destroyed [2] The western drawspan and the pontoons of the western half had broken loose and sank, despite the drawspan being opened to relieve lateral pressure.

At the time of the failure, the bridge had been closed to highway traffic and the tower crew had evacuated; no casualties resulted. Evidence points to blown-open hatches allowing flooding of the pontoons as the cause of the sinking.

West-half reconstruction and 1982 re-opening

Efforts to repair the bridge began immediately and Washington Secretary of Transportation William A. Bulley secured a commitment of federal emergency relief money for the project. On June 15, 1979 actual work began with the removal of the west truss and transport for storage. The Washington State Department of Transportation attempted to mitigate the impact of the disaster by redirecting traffic to US Highway 101 to drive around the 50 mile (80 km) Hood Canal and by re-establishing the Washington State ferry run between Lofall and South Point across the canal just south of the bridge. Hood Canal is a Fjord off Puget Sound in the US state of Washington. This page is about the ferry system operated by the state of Washington This route had been discontinued after the 1961 bridge opening and the state needed to re-acquire access to and restore operational conditions on both landings. During the course of the closure an additional ferry route was temporarily added between Edmonds and Port Townsend. Edmonds is a city in Snohomish County, Washington, United States. Port Townsend is a city in Jefferson County, Washington, United States.

The Hood Canal Bridge re-opened to vehicular traffic on October 25, 1982. Events 1147 - The Portuguese, under Afonso I, and Crusaders from England and Flanders conquer Lisbon after a Year 1982 ( MCMLXXXII) was a Common year starting on Friday (link displays the 1982 Gregorian calendar) The west-half replacement had been designed and constructed in less than three years using $100 million in federal emergency bridge replacement funds at a total cost of $143 million.

The bridge re-opened as a toll bridge, but tolls were lifted in 1985 after a court ruling that the insurance settlement constituted repayment of the construction bonds, and since federal funds were used in re-constructing the bridge, the Washington State Department of Transportation could not charge tolls after the bonds were retired. A toll bridge is a Bridge over which Traffic may pass upon payment of a fee or toll.

East-half replacement

The Washington State Department of Transportation is a pioneer in designing and building floating bridges: it holds the record for the first and the longest floating bridges, and four of the 11 permanent floating bridges in the world are in the Puget Sound region. The Washington State Department of Transportation ( WSDOT) was established in 1905

Currently, the Washington State Department of Transportation is replacing the east-half floating portion of the bridge, the east and west approach spans, the east and west transition spans and updating the west-half electrical system. The total cost of the project, about $471 million, is being paid by state, federal and agency funds. Beginning in May 2009, the bridge will be closed to traffic for six to eight weeks when the old pontoons of the east-half are cut away and the new pontoons are floated into position, cabled together and connected by cables to large anchors on the sea floor. The transition spans and center draw span will also be replaced during this closure.

The pontoons and anchors for the bridge could not be built at the bridge site due to space and facility limitations. WSDOT evaluated different sites at which to build during a site selection process. The Port Angeles graving dock was chosen for its accessibility to water and land as well as the work force. Before purchase, the National Historic Preservation Act required archaeologists to perform a review of the historical site. At that time, “there was no evidence of historic properties or cultural resources” (NEPA Re-evaluation Consultation, FHWA) and WSDOT was able to purchase the site and begin construction.

Within the first two weeks of construction, artifacts were found from an ancestral burial ground from an ancient village called Tse-whit-zen. WSDOT stopped all work on the site, and a government-to-government consultation process began among the Lower Elwha Klallam Tribe, WSDOT, the Federal Highway Administration, the Army Corps of Engineers, and the State Historical Preservation Office. On August 14, 2006, WSDOT agreed to donate the site to the Lower Elwha Klallam tribe, rebury all remains uncovered, and pay $2. 5 million in damages. [3]

It is believed that this discovery may be documentation of the first time that Natives and non-Natives began to interact on this shore. These historical findings will be investigated thoroughly by the Lower Elwha Klallam Tribe and archaeologists.

On December 21, 2004, Governor Locke and Secretary MacDonald announced that WSDOT would stop pontoon and anchor construction at the Tse-whit-zen site in Port Angeles and begin searching for a more suitable place to build. Many sites were considered but the best option to be found by WSDOT was in Tacoma, Wash. at Concrete Technology.


Construction began on the new east-half floating pontoons at Concrete Technology in April 2006. Fourteen pontoons will be built in four cycles at the site. Completed pontoons will be floated out of the graving dock in Tacoma and transported to Seattle for outfitting at Todd Shipyards. Outfitting includes adding all electrical and mechanical parts, connecting the pontoons into sections and building the roadway on top of the pontoons. Another three pontoons, built during the west-half bridge replacement in the early 1980s, will be retrofitted in Seattle.

When the project is complete, the Hood Canal Bridge will be wider, safer, and more affordable to maintain.

Usage

USS Ohio (SSBN-726), maneuvers through the drawspan of the Hood Canal Bridge returning to her homeport in Bangor, Washington.
USS Ohio (SSBN-726), maneuvers through the drawspan of the Hood Canal Bridge returning to her homeport in Bangor, Washington. Awards Acting Navy Secretary Robert B Pirie Jr announced the 2001 winners of the Navy Captain Edward F This article is about the US Navy base of Bangor in Washington USA

In planning for a prolonged closure of the bridge for the east-half replacement, the Washington State Department of Transportation conducted a five-day survey of bridge usage in early June 1998 in order to assess closure impact and plan effective mitigation strategies. The survey was in three stages: A video camera count of traffic on weekdays (Tuesday and Wednesday) and a weekend (Friday through Sunday) to estimate average volume; the use of that video to record license plate numbers for vehicle registration addresses to assess which communities would be most affected; and the mailing of a questionnaire to the registered owners of those vehicles seeking information on trip origin, destination, and purpose, and choice of travel alternatives during a bridge closure.

The video count produced a weekday average of 14,915 trips/day and a weekend average of 18,759 trips/day. The vehicle registration information indicated that a majority of trips were by residents of from communities near the bridge. The most represented communities were, in numerical order, Port Ludlow (8%), Port Townsend (7%), Port Angeles (6%), Seattle (6%), Sequim (5%), Poulsbo (5%), Bremerton (4%), Port Hadlock (2%), and Silverdale (2%). Port Ludlow is a Census-designated place (CDP in Jefferson County, Washington, United States. Port Townsend is a city in Jefferson County, Washington, United States. Port Angeles is a city in and the County seat of Clallam County, Washington, United States. Sequim (skwɪm is a city in Clallam County, Washington, United States. Poulsbo (the first syllable is pronounced like the name Paul is a city on Liberty Bay in Kitsap County, Washington, United States. Bremerton is a city in Kitsap County, Washington, United States. Port Hadlock-Irondale is a Census-designated place (CDP in Jefferson County, Washington, United States. Silverdale is a Census-designated place (CDP in Kitsap County, Washington, in the United States.

The questionnaires revealed that a majority of trips were to and/or from communities near the bridge. On the weekend 48% of westbound trips originated on the north and central Kitsap Peninsula, with 88% of the destinations in areas near Port Ludlow, Port Townsend, Sequim, and Port Angeles. The Kitsap Peninsula is an arm of land that is part of the larger Olympic Peninsula in Washington For weekday trips, nearly 55% of westbound trips originated in northern or central Kitsap County with 90% of the destinations in the Port Ludlow, Port Townsend, Sequim, and Port Angeles areas. A large number of eastbound weekday morning trips appeared to be for commuting purposes, with 92% of originating in Port Ludlow, Port Townsend, Sequim, or Port Angeles, and 60% with central or northern Kitsap County as a destination, and 32% ending in King and Snohomish counties. King County is located in the US state of Washington. The population in the 2000 census was 1737034 and in 2006 was an estimated 1835300 Snohomish (snow-HOE'-mish County is a County located in the U The evening westbound trips seemed to mirror the morning patterns. When asked the purpose of their trips, respondents reported that for weekend trips 21% were for recreational, 21% for social, 19% for personal, 18% for work, 6% for business, and 4% for medical reasons. For weekday trips 33% were for work, 17% for personal, 14% for business, 11% for medical, 9% for social, and 8% for recreational reasons.

Interesting Facts

Historical Construction Facts

Sources

References

  1. ^ SR 104, East Half, and SR 104, West Half, from National Bridge Inventory
  2. ^ "Hood Canal Bridge sinks during a severe storm on Tuesday, February 13, 1979"
  3. ^ Associated Press. "Settlement reached in Indian burial site" http://www.myrtlebeachonline.com/mld/myrtlebeachonline/news/breaking_news/15274953.htm August 14, 2006 (accessed September 19, 2006)

External links


Structurae is an online Database containing works of structural and Civil engineering of all kinds such as Bridges High-rise buildings A geographic coordinate system enables every location on the Earth to be specified in three coordinates using mainly a spherical coordinate system.
© 2009 citizendia.org; parts available under the terms of GNU Free Documentation License, from http://en.wikipedia.org